Proposed Network
The expected construction date is shown in parentheses.
North-South Routes
Carrall Street
(2006?)
Beatty Street
(May 2005)
Richards Street
(2005?)
Hornby Street
(May 2005) /
Burrard Street
(Aug 2005)
Cardero Street
(2005?)
Chilco Street
(2005?)
East-West Routes
Port Road
Georgia Street
(fall 2003) /
Pender Street
/
Dunsmuir Street
/ Melville Street
Georgia Viaduct
/
Dunsmuir Viaduct
/
Smithe Street
(fall 2003)
Haro / Nicola
(2006?)
Comox Street
/
Helmcken Street
Pacific Street (west of Burrard Bridge)
/
Pacific Boulevard redesign
(Burrard Bridge to Cambie Bridge, part done in fall 2003) /
Pacific and Expo Boulevards
(Northeast False Creek, fall 2003)
Beach Avenue
Other Routes
Robson St.
(2005?)
Homer St.
(May 2005)
Georgia Viaduct Connection
Granville St.
Bridges
[